Projects Budget checker Reviews The builder Start project intake Call (817) 555-0195

The projects

Six project types. One process: paper first.

Every project below runs the same rails — design to stamped drawings, a line-item fixed price, milestone draws, signed change orders, Friday walks, and the 11-month comeback. The rails are the product.

Project details

$90K–$250K · 4–7 MONTHS

Additions

Primary suites, second stories, family rooms — engineered to match the original structure and look like it was always there. Foundation to final paint under one contract.

  • Engineering, permits, HOA handled in-house
  • Weather-in milestones protect the existing house
  • Draws tied to visible milestones
$35K–$90K · 6–10 WEEKS

Kitchen remodels

Layout changes, structural openings, custom cabinetry — with a temporary-kitchen plan so the family still eats. Appliance and cabinet lead times are locked before demo, which is why our kitchens don't stall at week five.

$18K–$45K · 3–5 WEEKS

Bath remodels

Waterproofed like we plan to be blamed for it in ten years: flood-tested pans, membrane behind everything, and tile crews that have been ours for years.

$110K–$220K

ADUs & garages

Backyard apartments, garage conversions with real plumbing, and new garages with storage that survives contact with reality. Zoning and utility questions answered at intake, not at inspection.

$150K–$500K+ · 6–12 MONTHS

Whole-home remodels

Down-to-studs transformations where process is everything: phased schedules, weekly decisions batched to Fridays, and a client portal where every selection and change order lives in writing.

$45–$120 / SQ FT

Commercial build-outs

Tenant improvements and small commercial: clinics, offices, retail. Landlord-grade documentation, code-driven schedules, and openings that hit their announced dates.

Wondering what yours would run?

The budget checker ranges all six project types from real job history — twenty seconds, before anyone falls in love with a rendering.

Check my budget →Start project intake